ISSUE 03
OCT 2026
ANCHOR
INDEPENDENT MARITIME REVIEW
INSIDE THIS ISSUE
THE PRICE
OF A BERTH
WHY A
SHIP WAITS
THE FUEL CHANGED.
DID THE TRAINING?
THE FAMILY RUNS
ANOTHER WATCH
HORMUZ / CREW / CONSEQUENCES
DANGER
MONEY
Extraordinary pay. Exceptional risk.
What protection comes with the money?
SHIPLO.IN
IN MEMORY / 2026
24
THOSE WHO
NEVER RETURNED
In memory of the seafarers whose lives were lost
in attacks on shipping in the Strait of Hormuz
and the wider Middle East.
24 confirmed seafarer fatalities. IMO incident list, updated 14 October 2026.
Missing persons are not included in this confirmed fatality count.
Source: International Maritime Organization / checked 17 October 2026
ANCHOR
INSIDE ISSUE 03
CONTENTS
IDEAS, OPERATIONS AND LIFE AT SEA
04
Editor's note
The work and the people behind it.
05
The price of a berth
Recruitment, trust and the RPSL system.
08
Why a ship waits
The berth, the clock and the contract.
11
The Anchor Question
Six readers on life at sea.
12
What the handover didn't say
The information the next officer needs.
15
Danger money
The price of fear and the terms that
matter.
18
CrewConnect
Partner feature and conference
advertisement.
20
The fuel changed. Did the training?
Preparing the people taking the watch.
23
SNAME
Knowledge and a wider professional circle.
24
The family runs another watch
The work and adjustment continuing
ashore.
27
The cadet is watching
What our everyday conduct teaches.
30
Off watch, in the game
An independent preview of the maritime
games.
32
From the ANCHOR community
Shared tables, music and familiar faces.
34
The work behind the uniform
Four seafarers. Four perspectives.
36
Shiplo X ShipTek
Media partnership and event calendar.
37
Maritime Briefs
Professional updates, with dated sources.
39
Maritime directory
The complete listings and commercial
section.
03
Anchor Magazine
OCT 2026
CONTENTS
FROM THE EDITOR
Editor's
Note
WELCOME TO ANCHOR
MAGAZINE
Shipping asks ordinary people to carry
extraordinary responsibility.
We know the weight of taking over a watch,
trusting another person's work and handing it
on. That experience shapes what we ask of
ANCHOR.
C/E AMIT KHARETA
Editor-in-Chief
Some of the questions that stay with us are
simple. Who is accountable? Who can make the
decision? Who carries the consequences?
Those questions matter to the young seafarer
offered a first berth, the officer deciding whether
to speak up and the family trying to plan around
an uncertain return.
ANCHOR exists to understand those decisions
and give the people affected by them room to be
heard. Respect for this profession includes a
willingness to question its habits, listen beyond
familiar voices and follow the evidence when it
challenges our own assumptions.
We want readers to leave these pages with a
clearer understanding of the work and better
questions to take back to it. That requires care
with facts, room for disagreement and the
honesty to correct ourselves.
This has been our direction from the beginning.
Our commitment is to keep listening to the
people doing the work and asking what would
make it better.
UNDERSTAND THE WORK.
QUESTION THE DECISIONS.
LISTEN TO THE PEOPLE.
Published by SHIPLO.IN
04
Anchor Magazine
OCT 2026
FROM THE EDITOR
ANCHOR / RECRUITMENT / COMMENTARY
THE PRICE
OF A BERTH
Stronger oversight deserves support. The test is what changes
for the seafarer accepting a first ship.
BY C/E AMIT KHARETA
Illustration
A berth is supposed to be the beginning of a
career. When the conversation starts with how
many lakhs a young person must pay to obtain it,
the industry has already failed that person.
In conversations with seafarers and people in
recruitment, I repeatedly hear of cadets and
ratings being asked for Rs 5-6 lakh for a first
vessel. That is my experience of those
conversations, not a measured national rate or an
allegation against a named company. It is enough
to make the question worth asking: who is
accountable when the promise of a ship becomes a
transaction with a middleman?
I run an RPSL company. More compliance means
more work and expense for us too. I support
stronger oversight, provided it tests the things
that protect a seafarer and gives an honest
operator a workable route to comply.
THE PROBLEM HAS A PAPER TRAIL
The regulator has described the failures in
concrete terms. DGS Order 08 of 2026 records
unpaid wages, difficulty arranging repatriation,
discrepancies between the vessel in an
employment agreement or Form I and the vessel
actually joined, and involvement of multiple
recruiting agencies. It also records problems with
compensation and recognition of sea service.
These are regulatory findings, rather than a
judgement about every recruitment business. [1]
The paperwork matters because it identifies who
promised what. A young seafarer can hold a
collection of apparently convincing documents
and still need to establish whether the recruiter,
shipowner and vessel form one genuine
employment arrangement.
The Maritime Labour Convention already requires
a recruitment system without recruitment or
placement charges to the seafarer. Its limited
exceptions concern specified personal documents;
visa costs are for the shipowner. A payment
demanded simply to secure employment does not
become acceptable because somebody calls it a
service charge. [2]
05
Anchor Magazine
OCT 2026
RECRUITMENT
ANCHOR / RECRUITMENT
THE PRICE OF A BERTH
A HIGHER GUARANTEE, A REAL BUSINESS TEST
The 2026 recruitment rules increase the
bank-guarantee requirements. The lowest capacity
band, up to 50 seafarers, requires Rs 25 lakh; the
highest, above 1,000, requires Rs 1 crore. The full
table is shown alongside. Existing valid 2016
licensees have a three-year period for the
differential guarantee, with an exception when
seeking expansion. [3]
A guarantee is a contingent financial commitment.
Its face value should not be described as a
non-refundable government fee or assumed to be
an identical cash deposit for every company.
Banking terms, collateral and access to credit
determine how heavily it bears on a particular
business.
That distinction matters to the debate about small
operators. A small firm can be competent and
responsible. A larger balance sheet does not
establish honest recruitment. If good smaller firms
leave because finance becomes inaccessible, a
policy can reduce competition without proving
that it removed fraud.
The useful test is whether the agency can support
the commitments it makes: identify its principals,
understand the employment arrangement, answer
a complaint and help when a seafarer is stranded.
Inspections should test that capability through
records and actual performance.
A SMALL FIRM CAN BE
COMPETENT AND
RESPONSIBLE.
THE GUARANTEE / RULE 8
Capacity band and required bank guarantee
Up to 50
Rs 25 lakh
Up to 250
Rs 40 lakh
Up to 500
Rs 55 lakh
Up to 750
Rs 70 lakh
Up to 1,000
Rs 85 lakh
Above 1,000
Rs 1 crore
Capacity bands for proposed placements on Indian-flag and
foreign-flag ships; not annual recruitment counts. Source [3],
English text.
FORM 1B IS PART OF THE CHANGE
DGMA Circular 68 of 2026, dated 13 October, sets
15 October for the enhanced RPSL beta module. It
provides for a unified licence covering seafarers
and applicable non-seafarer or technician
categories, and explicitly provides existing RPS
agencies access to generate Form 1B. [4]
It discontinues fresh separate non-seafarer
e-Migrate authorisations under Merchant
Shipping Notice 02 of 2018. Existing separately
authorised entities, other than existing RPSL
holders, are asked to transition within three
months of the circular. The circular schedules
further digital processes for 1 November; a
scheduled rollout should not be confused with
verified operation.
This brings applicable deployments into a more
unified licensing framework. It does not make
every technician a seafarer, or prove that every
business using the earlier route behaved
improperly. Those distinctions deserve to survive
even a strongly worded debate.
06
Anchor Magazine
OCT 2026
RECRUITMENT
ANCHOR / RECRUITMENT
THE PRICE OF A BERTH
RPSL STATUS / 15 OCTOBER 2026
537
VALID RPSLs
397
INVALID RPSLs
66
TEMPORARILY BLOCKED RPSLs
CHECK THE RPSL STATUS
An ANCHOR check of the DGS RPSL list on 15
October showed 537 valid RPSLs, 397 invalid
RPSLs and 66 temporarily blocked RPSLs. These
were the listed statuses on that date. An invalid or
blocked status alone is not a finding of fraud. One
snapshot cannot explain how far the market has
shrunk, or why.
DGS Circular 55 of 2025 warns about
unauthorised intermediaries and impersonation. It
advises live licence checks and verification of
joining documents, including the Application
Reference Number and passport details. [5] A
genuine licence number can still be copied into a
false offer. The company behind the offer must
confirm it through independently checked contact
details.
MEASURE WHAT REACHES THE SEAFARER
A grievance system earns trust through what
happens after submission: a traceable case, a clear
response, proper escalation and an outcome the
person can understand. DGMA Circular 67 of
2026 requires prominent display of its 24-hour
grievance information at training institutes and
RPSL establishments. [6] Visibility is useful;
resolution is the measure that follows.
The evidence to look for is practical. Are fewer
people paying for jobs? Are ship and contract
details matching? Are unpaid wages recovered?
Are stranded people brought home sooner? Are
complaints resolved fairly, with reasons? Those
questions can test improvement without assuming
that fewer valid RPSLs mean a cleaner industry.
My support for tighter oversight comes with the
same expectation I would place on my own
company: the work must be visible in the
seafarer's experience. A stronger system should
make a first berth safer to accept, and a
recruitment promise harder to abandon.
FEWER VALID RPSLs
ALONE DO NOT PROVE
A CLEANER INDUSTRY.
Interest disclosure: the author runs Barrow & Trent, an RPSL
company. This commentary reflects that perspective and the
public sources listed below.
SOURCES / CHECKED 16 OCTOBER 2026
[1] DGS Order 08/2026, 14 May: preventive measures on abandonment
[2] ILO MLC, Standard A1.4: recruitment and placement
[3] Merchant Shipping (Recruitment and Placement of Seafarers) Rules, 2026;
rule 8
[4] DGMA Circular 68/2026, 13 October: enhanced RPSL module
[5] DGS Circular 55/2025, 11 December: recruitment fraud advisory
[6] DGMA Circular 67/2026, 9 October: grievance contacts
RPSL list: official e-Samudra guest list, checked 15 October 2026 at 7:42 p.m.; live status may change.
07
Anchor Magazine
OCT 2026
RECRUITMENT
ANCHOR / SHIP AND PORT / ANALYSIS
WHY A
SHIP WAITS
The berth, the clock and the commercial reason to arrive.
RESEARCH AND ANALYSIS / ANCHOR
Container-ship crew, Panama Canal / 2006
A ship can reach the port on time and still be too
early for the work it came to do. The berth may be
occupied. The cargo may not be ready. The pilot,
tugs and tidal window may not coincide. An arrival
time is only one part of a port call.
That makes the familiar question - why did we
hurry, only to anchor? - more interesting than it
first appears. The answer can involve both an
operational bottleneck and a commercial reason
for reaching the waiting place. Solving one does
not automatically solve the other.
THREE CLOCKS, ONE SHIP
There is the ship's clock: the passage plan and the
time needed to arrive safely. There is the port's
clock: when the berth, approach and services can
actually receive it. Then there is the contract's
clock: when obligations are met and particular
time begins to count. These clocks can point
towards different decisions.
BIMCO's Laytime Definitions for Charter Parties
2013 distinguishes laytime, the agreed period
available for loading or discharge without extra
payment beyond freight, from demurrage, the
agreed amount payable for qualifying delay after
laytime expires. Its definitions apply when
expressly incorporated into the contract. The
anchorage watch cannot establish a claim merely
by counting hours. [1]
The same definitions distinguish a notice of
readiness from a simple arrival message. The
notice concerns arrival at the relevant port or
berth and readiness to load or discharge. The
contract, facts and applicable law determine
whether it is effective. An estimated time of
arrival is a forecast; it is not that notice. [1]
08
Anchor Magazine
OCT 2026
SHIP AND PORT
ANCHOR / SHIP AND PORT
WHY A SHIP WAITS
THE COMMERCIAL REASON TO ARRIVE
The IMO-backed Just In Time Arrival Guide
identifies contractual barriers in voyage
chartering. A master may be expected to proceed
with due despatch even after learning that a berth
will remain occupied. Changing speed can
therefore require a commercial agreement as well
as a better estimate from the terminal. The guide
maps the interdependence of ship, terminal and
port services. [2]
Some contracts expressly address waiting.
BIMCO's Waiting for Berth Clause 2002, for
example, provides for a notice at or off the port
when the berth is unavailable, subject to its
wording and the master warranting actual
readiness. It also treats the subsequent movement
to the berth separately. This is a published clause
that parties may use, not a rule automatically
governing every voyage. [3]
That difference matters when somebody calls
waiting time profitable. Who receives freight, pays
for fuel, carries the cost of extra voyage time or
owes compensation depends on the arrangement.
Even where a claim is available, it does not make
the physical delay disappear. Nor does it make the
ship's next commitment any easier to meet.
ARRIVE WHEN THE PORT CAN RECEIVE YOU
Just-in-time arrival aims to align speed with an
assured opportunity to enter: a berth, fairway and
nautical services available together. It requires a
dependable requested arrival time at the
appropriate location, exchanged early enough to
influence the passage. Slowing down on an
uncertain rumour is a poor substitute for
coordinated planning.
A 2022 study commissioned by the IMO-Norway
GreenVoyage2050 project examined container
voyages using 2019 AIS data. Its modelling found
mean fuel savings of 14.16% when optimisation
covered the whole voyage, 5.90% over the final 24
hours and 4.23% over the final 12 hours. Those are
modelled results for that study, not guaranteed
savings for a particular tanker or bulk carrier. [4]
The useful finding is that information arriving late
can still have value, while earlier coordination
offers more room to act. A terminal need not
promise impossible certainty. It does need to
distinguish a working estimate from an agreed
operational request, and make a changed plan
visible to the people relying on it.
EARLIER COORDINATION / MORE ROOM TO ACT
MODELLED MEAN FUEL SAVING PER CONTAINER VOYAGE
Whole voyage
14.16%
Last 24 hours
5.90%
Last 12 hours
4.23%
Source [4]: 2022 modelling using 2019 AIS data. Common bar scale: 0-15%. Results are scenario averages.
09
Anchor Magazine
OCT 2026
SHIP AND PORT
ANCHOR / SHIP AND PORT
WHY A SHIP WAITS
A NEW CLAUSE, STILL IN DEVELOPMENT
In August 2026, BIMCO described a draft Virtual
Notice of Readiness and Just in Time Arrival
Clause for voyage charter parties. The proposal
addresses ports where a digital queue can be joined
before physical arrival, while conventional notice
requirements still depend on arrival at the
contractual place. [5]
BIMCO says its draft would allow virtual notice
where the port facilitates it and charterers
consent, with other validity requirements
satisfied. It also proposes a framework for
requested speed changes, sharing fuel savings and
compensating additional voyage time. At the
research cut-off, this source describes
development and consultation. It does not
establish a universally available right to tender
notice from sea. [5]
The importance is the problem it recognises:
cooperation becomes harder when one party saves
fuel while another carries uncompensated time or
contractual exposure. The instruction to optimise
arrival needs an agreement about those
consequences.
THE BOTTLENECK MAY BE ASHORE
The IMO ship-port interface portal also identifies
pre-clearance of customs, immigration, health and
other formalities as a way to reduce waiting.
Port-call optimisation includes coordinating
services and departure, rather than concentrating
only on the ship's approach. Clearing one stage
while a critical service remains unfinished merely
moves the queue. [6]
For the ship, a useful delay record should explain
what prevented the next movement, who supplied
that information and when the plan changed.
Arrival, readiness, service availability and
movement are separate events. Recording them
separately helps the office examine the cause; a
commercial claim still needs its own contractual
assessment.
For the office, the better question is precise: what
information or agreement would have allowed this
ship to use its time differently? A berth forecast?
Confirmed pilot availability? Cargo readiness?
Authority to alter speed without prejudicing the
contract? Each answer points to someone who can
change the next call.
The ship waiting at anchor is the visible end of a
much larger sequence of decisions. A credible
improvement connects the timetable, the
operational plan and the commercial terms before
the crew receives another urgent arrival
instruction.
WHAT WOULD HAVE ALLOWED THIS SHIP TO USE ITS TIME
DIFFERENTLY?
SOURCES / CHECKED 17 OCTOBER 2026
[1] BIMCO, Laytime Definitions for Charter Parties 2013 (especially definitions
5, 25 and 30).
[2] IMO / Low Carbon GIA, Just In Time Arrival Guide (2020), port-call process
and contractual barriers.
[3] BIMCO, Waiting for Berth Clause 2002.
[4] IMO, Lowering containership emissions through Just In Time arrivals (7
June 2022).
[5] BIMCO, consultation on a Virtual NOR / JIT clause (21 August 2026). Draft
status.
[6] IMO GreenVoyage2050, Ship-Port Interface Measures Portal.
10
Anchor Magazine
OCT 2026
SHIP AND PORT
THE ANCHOR QUESTION / READER RESPONSES
WHAT'S ONE THING YOU'D
CHANGE ABOUT LIFE AT SEA?
One question. Six responses, identified by rank.
Compiled by Azizur Rahman
DECK CADET
Time to learn
Protected training time, a named mentor and room
to ask a basic question without humiliation.
Getting through the day's jobs should leave time to
understand why they are done, and how progress
towards the first qualification is being assessed.
SECOND OFFICER
Protect the watch
Give navigation the attention it needs. Passage
preparation and administrative work need
realistic time outside the watch, with enough
uninterrupted rest to arrive on the bridge alert.
More screens do not remove the need for a
functioning bridge team.
FOURTH ENGINEER
A proper handover
Make the move from supervised learning to
responsibility less abrupt. A useful handover,
accessible manuals and a senior engineer willing to
explain an unfamiliar system would help a new
officer report honestly and ask for help before a
problem grows.
ABLE SEAFARER / AB
A voice that counts
Listen to the people doing the deck work and
standing lookout. Clear task priorities, decent
recovery time and a respectful response when
someone raises a concern would make it easier to
work safely and feel part of the team.
CHIEF OFFICER
Responsibility with enough support
Cargo, deck maintenance, inspections and the
team's welfare compete for the same hours. Match
the workload with people and time, and make it
possible to raise an unrealistic demand ashore
before fatigue becomes the way the job gets
finished.
MASTER
Support the decision to stop
Give the person responsible for the ship credible
shore support when safety requires a delay or a
different plan. Commercial schedules, staffing and
paperwork should allow the master to protect the
crew's rest and exercise professional judgement.
SEND YOUR QUESTION: amit.khareta@anchormagazine.in
Reader responses supplied to ANCHOR. Respondents are identified by rank.
11
Anchor Magazine
OCT 2026
COMMUNITY
ANCHOR / OPERATIONS
WHAT THE HANDOVER
DIDN'T SAY
A ship's operating history must survive the people who leave it.
Three investigations show what happens when essential information is lost.
C/E Paramveer / Community photograph
On 6 May 2025, three crew
members aboard the tanker
Wisdom Venture suffered burns
during maintenance on a steam
valve near Sydney. Residual hot
condensate escaped when the
valve was opened.
The Australian Transport Safety
Bureau identified a permanent
modification to a drain line that
had not been documented or
formally assessed. It predated
both the outgoing and incoming
chief engineers. The change was
absent from previous handover
records and had escaped
superintendent inspections.
The relieving chief engineer had
joined on 17 April for a parallel
handover - 19 days before the
accident.
THE SHIP'S HISTORY
HAS TO SURVIVE
THE CHANGE OF CREW.
Community portrait. The investigations discussed concern other vessels.
12
Anchor Magazine
OCT 2026
OPERATIONS
ANCHOR / OPERATIONS
WHAT THE HANDOVER DIDN'T SAY
Container-ship bridge / Haus / Archive photograph
ECDIS, 2006 / Doclecter
Yet the altered arrangement and its risks had not
been properly communicated. Insufficient cooling
time and incomplete verification of
depressurisation also contributed to the
injuries. [1]
The case raises a practical question about what
overlap achieves. Time together creates an
opportunity to exchange knowledge. Its value
depends on whether the information being
exchanged accurately describes the ship.
A modification can become familiar to successive
crews while remaining absent from drawings,
maintenance records and risk assessments. Each
person taking over then inherits the same
incomplete explanation.
THE DETAIL THAT CHANGES THE JOB
MAIB's Safety Digest 1/2021 describes a
generator starter motor sent ashore for overhaul.
A chief engineer changed while the repair was
underway. The outgoing engineer mentioned the
motor's removal in general terms in his handover
notes.
When the overhauled motor returned, the relief
engineer reinstalled it. Incorrect electrical
connections caused smoke and a small fire. Some
positive cabling on that engine model was black, a
detail omitted from the handover and overlooked
during reconnection.
MAIB highlighted detailed notes, photographs and
references to the manufacturer's instructions,
alongside the need for the person resuming the
work to establish the correct procedure. [2]
An unfinished maintenance job requires a precise
account of where work stopped. The incoming
officer needs to understand what was removed,
what remains isolated, what has been checked and
what still requires verification.
A job title and a completion percentage leave
considerable room for assumptions. Photographs
and notes become useful when they explain the
actual condition in which the equipment has been
left.
The consequences can also cross departmental
boundaries.
AMSA investigated a landing barge collision on 16
March 2022 following a last-minute change of
engineers. The outgoing engineer failed to tell the
incoming engineer that the port main engine's
cooling-water suction valve was shut.
13
Anchor Magazine
OCT 2026
OPERATIONS
ANCHOR / OPERATIONS
WHAT THE HANDOVER DIDN'T SAY
The engine overheated after departure. While
investigating the problem, the master became
distracted from navigation and the vessel struck a
channel marker. The investigation identified
missing engineering handover procedures
alongside the master's loss of navigational
attention. [3]
The valve's condition mattered to the engineer
receiving the ship. Its effect on propulsion also
mattered to the person navigating it. Information
must reach everyone whose decisions depend on
it.
WHAT TAKING OVER SHOULD ESTABLISH
These cases point to three distinct subjects for a
handover: the equipment's actual configuration,
the state of unfinished work and the ship's present
operating limitations.
They require different evidence. An approved
drawing can explain a modification. A
maintenance record can establish what work was
completed. A current isolation record can identify
equipment unavailable for service. A verbal
explanation helps connect those records to the
equipment and the operation ahead.
A useful discussion should also expose
uncertainty. Record unexplained recurring faults.
Where a repair is reported, identify the work and
its verification. Where an operating restriction
remains, explain its scope to the people affected.
The incoming officer still has to examine the
information and verify conditions appropriate to
the task. Handover supports that judgement;
subsequent work requires its own planning, risk
assessment and controls.
Company arrangements have a substantial role
here. The ISM Code addresses familiarisation,
maintenance records and control of
safety-management documentation. Essential
instructions before sailing are to be identified,
documented and provided. These provisions place
the transfer of knowledge within a continuing
management system. [4]
An effective company process should make
relevant records available before joining, direct
overlap towards significant risks and give
unresolved items a named owner ashore or aboard.
When the installed arrangement differs from the
records, that discrepancy needs investigation and
appropriate control.
The next officer should leave the handover able to
explain the ship's current condition, the
restrictions affecting its operation and the next
action on each significant unresolved item.
FOR EACH UNRESOLVED ITEM
01 / CONDITION
The actual state, including modifications and
unfinished work.
02 / EVIDENCE
The drawing, maintenance entry, photograph
or test record.
03 / LIMITATION
What remains restricted or unverified, and
who needs to know.
04 / ACTION
What happens next, who owns it and when it is
reviewed.
THE NEXT OFFICER
NEEDS THE WHOLE STORY.
SOURCES
[1] ATSB MO-2025-004 (2025)
[2] MAIB Safety Digest 1/2021, Case 15
[3] AMSA: landing-barge collision (2022)
[4] IMO ISM Code, sections 6, 10 and 11
14
Anchor Magazine
OCT 2026
OPERATIONS
ANCHOR / HORMUZ / ANALYSIS
DANGER
MONEY
Extraordinary pay. Exceptional risk.
What protection comes with the money?
Illustration
A salary large enough to change a family's finances
can make a dangerous voyage sound like an
opportunity. The number is immediate. The
consequences are harder to put on a payslip.
On 6 October, the Financial Times reported tanker
captains receiving rates equivalent to as much as
$100,000 a month, with a reported $50,000 bonus
per Hormuz transit. Its publicly shared report also
described ordinary crew receiving four to six times
normal rates. These were reported packages, not a
universal wage scale. [1]
That distinction is where the useful conversation
begins. Which ship? Which employer? Which
dates? Is the amount a monthly equivalent, an
actual guaranteed monthly wage, or a payment
triggered by completing a particular passage?
Without those answers, a spectacular figure tells a
seafarer very little about an offer.
THE NUMBER IS IMMEDIATE.
THE CONSEQUENCES ARE
HARDER TO PUT ON A PAYSLIP.
15
Anchor Magazine
OCT 2026
HORMUZ
ANCHOR / HORMUZ
DANGER MONEY
THE PAYSLIP DOES NOT DESCRIBE THE RISK
IMO's confirmed incident list, updated on 14
October, includes GFS Pride as sunk following a
13 October incident in the Strait of Hormuz, and
other vessels damaged that day. Its regional
information also records deaths, injuries and
missing seafarers across earlier incidents. [2] A
dated list is more useful than repeatedly
circulating an old total as though it were current.
The person agreeing to sail is assessing more than
the likelihood of a single attack. There is time in
the area, time waiting at anchor, the possibility of
delayed relief and what happens if the intended
exit becomes unavailable. An offer framed around
one transit needs to explain the employment
arrangement if the voyage changes.
Risk cannot be priced by the crew member alone.
The employer has information about the vessel,
intended employment, security arrangements,
insurance and contractual protections that the
person considering the offer may not yet possess.
Meaningful agreement requires that information
to travel in the same direction as the offer.
A BONUS AND AN ENTITLEMENT ARE DIFFERENT
An individually negotiated incentive is one part of
pay. A benefit under an applicable collective
agreement is another. Their amounts, triggers and
duration may differ. Ask how a special offer
interacts with the ship's existing agreement, rather
than assuming one advertised figure includes
everything.
For covered ships, the IBF list agreed on 1 October
and extended to 22 October designates a defined
Persian Gulf, Hormuz and Gulf of Oman area as
Warlike Operations Area. It provides a bonus
equal to basic wage, with a five-day minimum and
further payment for longer stays, and doubled
death and disability compensation. [3]
The same designation includes the right not to
proceed, repatriation at company cost and
compensation of two months' basic wage. It also
requires enhanced security arrangements
equivalent to ISPS Level 3. Geography and
agreement coverage matter: adjacent areas have
different conditions. These provisions are not
automatic terms on every ship or a replacement
for checking the current text.
The list is time-limited. A screenshot shared by a
friend can be accurate when sent and stale when
somebody joins. The relevant agreement,
designation, coordinates and date need to be
checked together with the company and the
seafarer's representative.
A PAY OFFER NEEDS
A PRECISE EXPLANATION
OF WHAT THE CREW
IS ASKED TO ACCEPT.
BEFORE YOU COMPARE THE FIGURES
Check the ship and the employer.
Read the applicable agreement.
Confirm the designation and its dates.
Ask how the additional pay is calculated.
16
Anchor Magazine
OCT 2026
HORMUZ
ANCHOR / HORMUZ
DANGER MONEY
WHAT AN INFORMED CHOICE REQUIRES
Before agreement, the crew needs a clear
description of intended employment and the
current company risk assessment. They need to
understand the security briefing, how emergency
instructions will be communicated, and whom
they can approach if the arrangement changes.
The particulars belong in the discussion before
joining, while questions can still affect the
decision.
A written pay explanation should state the basic
wage, additional payment, currency and
calculation period. It should explain the event that
earns a transit bonus, how waiting time is treated,
when money becomes payable and what happens
if the vessel cannot complete the intended
passage.
Insurance needs equally careful language. The sum
paid to insure a ship is not a crew benefit. A high
hull war-risk premium says nothing by itself about
a family's entitlement after an injury or death. The
relevant employment terms, collective agreement
and financial-security documents answer different
questions.
The MLC treats repatriation and shipowners'
liability as specific protections within its
applicable framework. [4] The actual documents
and applicable law matter. A verbal assurance that
someone is fully covered is too vague to explain
the route to help, the responsible party or the
terms of a claim.
THE DIFFICULT PART OF SAYING NO
A person with debt, family expenses or a long wait
between contracts can find an exceptional offer
persuasive. That is a reason to take the decision
seriously. It is not a reason to dismiss the person as
reckless or to treat acceptance as evidence that
every question was answered.
The practical test of a choice includes what follows
refusal. If the applicable agreement gives a right
not to proceed, the company should explain how it
is exercised, who arranges relief and repatriation,
and how the person receives the stated benefits.
Uncertainty about those steps can make a paper
right difficult to use.
Managers have a corresponding responsibility to
keep the discussion factual. A crew member asking
about cover, relief or the right to refuse is asking
about the conditions of employment. Those
questions deserve a clear answer before a yes is
requested.
MONEY STILL MATTERS
There is no need to pretend that compensation is
unimportant. Seafarers work for a living.
Exceptional demands can justify exceptional pay.
The error is allowing a large number to become the
entire explanation of what the company is asking
someone to accept.
The more extraordinary the offer, the more
precise the explanation should be. What is paid,
what is protected, what can change and what
choices remain should all be clear enough for the
crew member to explain them to somebody at
home.
Danger money recognises that an assignment
carries exceptional risk. It does not discharge the
responsibility to reduce that risk, inform the crew
or honour their agreements. Those responsibilities
continue after the bonus has been negotiated.
PUT THE OFFER IN WRITING
Basic wage / additional pay / qualifying event / waiting time / payment date / relief and repatriation
SOURCES / CHECKED 16 OCTOBER 2026
[1] Financial Times, 6 October 2026; publicly shared report by u/financialtimes
[2] IMO confirmed incident list, updated 14 October 2026
[3] IBF designated risk areas, agreed 1 October; extended to 22 October 2026
[4] ILO MLC: repatriation, shipowners' liability and applicable standards
17
Anchor Magazine
OCT 2026
HORMUZ
PARTNERSHIP / SHIPLO X CREWCONNECT GLOBAL
CREW MANAGEMENT
UNDER THE SPOTLIGHT
Shiplo will take your stories to Manila.
Full media coverage in the next edition.
CrewConnect Global / Partner archive
CrewConnect Global 2026 takes place from 20-22
October at Shangri-La The Fort, Manila,
Philippines. The conference brings shipowners,
associations, charities, educational institutions
and other stakeholders together around crewing,
training and seafarer welfare.
FIVE PRESSURES ON THE AGENDA
The partner programme highlights five connected
issues: geopolitical uncertainty and seafarers
caught between sanctions, war and international
law; the hidden costs of the officer shortage;
abandonment and criminalisation; preparing
crews for rapidly advancing technology; and the
gap between recorded rest-hour compliance and
actual fatigue.
These subjects reach beyond a crewing
department. They concern the people accepting a
contract, the officers carrying responsibility
aboard and the shore teams expected to support
them.
THE PEOPLE IN THE ROOM
Andreas Nordseth and Guy Platten co-chair the
conference. The partner programme identifies
participation from BIMCO, Holland America Line
and Seabourn, the ITF, the Philippines
Shipowners Association, the International
Chamber of Shipping, World Maritime University,
ISWAN and OSM Thome.
It also lists Wilhelmsen Ship Management,
Anglo-Eastern, Columbia Shipmanagement,
Bernhard Schulte Shipmanagement, Teekay
Shipping, Marlow Navigation, BW Group, Synergy
Marine Group, Holland America Group and the
Norwegian Shipowners Association among
participating organisations.
BEYOND THE CONFERENCE SESSIONS
A dedicated expo will feature crewing technology,
training simulators and welfare solutions.
Structured networking, private meeting spaces
and social events will give delegates time to
continue discussions and make professional
connections.
Shiplo will bring media coverage in the next
edition. Current programme, attendance and
registration information is available from the
organiser.
PROGRAMME AND REGISTRATION / CREWCONNECT GLOBAL
18
Anchor Magazine
OCT 2026
PARTNERSHIP
24
OCT 2026
Anchor Magazine
ADVERTISEMENT
19
Anchor Magazine
OCT 2026
ADVERTISEMENT
ANCHOR / ENGINEERING / ANALYSIS
THE FUEL CHANGED.
DID THE TRAINING?
New fuels are already a crewing question.
Preparation must reach the person taking the watch.
Chief engineer on watch, ferry Bastø IV / Ulflarsen
A fuel change arrives aboard as equipment: tanks,
pipework, controls, alarms and operating limits.
For the person taking the watch, it also changes
the questions that must be answered before an
ordinary task is safe. Experience remains valuable.
Its assumptions need checking against the new
installation.
Shipping has spent years discussing which fuels
will power the next fleet. The practical question is
now closer: what will the people assigned to those
ships be prepared to do? A course title on a joining
checklist provides only part of that answer.
Shipboard work illustrated above; this photograph does not depict an alternative-fuel installation.
20
Anchor Magazine
OCT 2026
ENGINEERING